Research History: every research run on a project, past and live
Research History is the last item under a project in the sidebar. It lists every research run on the project, newest first, and shows the one in progress. A run is what turns a niche into ranked opportunities; the data-backed path explains what it does.
What the screen shows
A line under the heading says how old the project's data is.
While a run is going, a Research in Progress card sits at the top with four figures: Duration, Est. Finish, Keywords and Competitors. Below them, Currently analyzing names the keyword or competitor being worked on, and a bar shows percent complete and minutes remaining. That bar tracks time, not work done: it assumes about an hour from the start and never projects less than five minutes ahead. When the run finishes, the table refreshes on its own.
Each finished run is a row:
| Column | What it holds |
|---|---|
| (icon) | A check for completed, an alert for failed |
| Run ID | The first 12 characters of the run's id |
| Started | Date and time the run began |
| Duration | Start to end, or a dash when no end time is recorded |
| Keywords | Keywords discovered |
| Companies | Companies discovered |
| Status | completed or error |
A completed row also has a Pitch report button.
Phases and errors
A run moves through four phases: Discover, SERP, Profile and Cluster. The rows do not show them. The live phase appears on the project Overview while the run is going, and from get_research_status, which reports initializing before the first phase starts.
A failed row shows only the error status. The Overview explains the failure in plain words on its error card. Over MCP, get_research_status returns a failure object with a failureClass, the phase the run died in and a retryable flag, for the latest run only.
A run still marked running after two hours is treated as stuck and closed as failed; the check runs every 15 minutes.
Credits
Starting a run spends one research credit, and the confirmation says so. A failed run gives its credit back, stuck runs included, so a failure leaves your balance where it was. Credits per plan are on Free and paid.
What you can do here
- New Research opens Start New Research, which states the credit cost, with Cancel and Start Research. While a run is in progress the button is disabled, with the tooltip "A research is already in progress". With no runs yet, the empty state offers Start First Research.
- There is no retry button on a failed row. Start a new run here, or use Retry Analysis on the Overview's error card; either one spends a credit, and the failed run's credit has already been returned.
- Pitch report downloads a VarynForge-branded PDF of that run. When your site profile was last synced before the run, a dialog first offers Re-sync profile first or generating with the profile as it is. Client reports covers the report itself.
The same runs over MCP
start_research_runstarts a run and returns itsrunId. Over MCP it can start at most once a minute.get_research_statusreads the latest run only. No MCP tool lists past runs.get_pitch_report_payloadtakes a completed run'srunIdand returns the pitch report as data to render in your own template.resync_asset_profileis the re-sync choice.
Markdown version of this page, for your agent.