All pages

Research History: every research run on a project, past and live

Research History is the last item under a project in the sidebar. It lists every research run on the project, newest first, and shows the one in progress. A run is what turns a niche into ranked opportunities; the data-backed path explains what it does.

What the screen shows

A line under the heading says how old the project's data is.

While a run is going, a Research in Progress card sits at the top with four figures: Duration, Est. Finish, Keywords and Competitors. Below them, Currently analyzing names the keyword or competitor being worked on, and a bar shows percent complete and minutes remaining. That bar tracks time, not work done: it assumes about an hour from the start and never projects less than five minutes ahead. When the run finishes, the table refreshes on its own.

Each finished run is a row:

ColumnWhat it holds
(icon)A check for completed, an alert for failed
Run IDThe first 12 characters of the run's id
StartedDate and time the run began
DurationStart to end, or a dash when no end time is recorded
KeywordsKeywords discovered
CompaniesCompanies discovered
Statuscompleted or error

A completed row also has a Pitch report button.

Phases and errors

A run moves through four phases: Discover, SERP, Profile and Cluster. The rows do not show them. The live phase appears on the project Overview while the run is going, and from get_research_status, which reports initializing before the first phase starts.

A failed row shows only the error status. The Overview explains the failure in plain words on its error card. Over MCP, get_research_status returns a failure object with a failureClass, the phase the run died in and a retryable flag, for the latest run only.

A run still marked running after two hours is treated as stuck and closed as failed; the check runs every 15 minutes.

Credits

Starting a run spends one research credit, and the confirmation says so. A failed run gives its credit back, stuck runs included, so a failure leaves your balance where it was. Credits per plan are on Free and paid.

What you can do here

  • New Research opens Start New Research, which states the credit cost, with Cancel and Start Research. While a run is in progress the button is disabled, with the tooltip "A research is already in progress". With no runs yet, the empty state offers Start First Research.
  • There is no retry button on a failed row. Start a new run here, or use Retry Analysis on the Overview's error card; either one spends a credit, and the failed run's credit has already been returned.
  • Pitch report downloads a VarynForge-branded PDF of that run. When your site profile was last synced before the run, a dialog first offers Re-sync profile first or generating with the profile as it is. Client reports covers the report itself.

The same runs over MCP

  • start_research_run starts a run and returns its runId. Over MCP it can start at most once a minute.
  • get_research_status reads the latest run only. No MCP tool lists past runs.
  • get_pitch_report_payload takes a completed run's runId and returns the pitch report as data to render in your own template. resync_asset_profile is the re-sync choice.

Markdown version of this page, for your agent.